In general projects in the lab are divided into three groups:
- Smaller, shorter (1-10days) project using standard equipment and procedures as the L2 Standard testing package.
- Medium projects (2-12weeks) project using standard equipment and procedures with possible minor modification but allocate a large amou nt of resources.
- Large projects, this is mainly rated on the development time and manpower needed. Measurement might take a week but require 6-18month of development and testing, as building a new wind tunnel.